A windrow describes the shape of the pile; forced aeration describes what moves air; a membrane describes what covers the material. The three can be combined. Compare the whole facility and identify where air, water and emissions are controlled, rather than comparing equipment labels alone. [1–3, 6] See The full workflow of a composting facility.

Turned windrows

The mix is formed into long rows. A windrow turner lifts and mixes the material, breaks up clumps and redistributes material from the core and the edges. In a windrow without forced aeration, air movement is mainly passive between turns. A tall, wet, dense windrow may exchange less air at the core than one with a more open structure. Allow for equipment access and manoeuvring as well as the windrow footprint. In operation, use temperature and moisture trends at several locations, the weather and the site's sanitisation procedure when scheduling turning. [1–4] See Temperature and sanitisation.

A CMC350 windrow turner working on a windrow of plant material.
Photo: Compost Systems Mechanical turning of a windrow with a CMC350, an example of operation in an open system.

Aerated static piles

A blower moves air through the composting mass, which is not routinely turned as it would be in a turned windrow. A well-mixed feed and a structure that stays permeable are essential. Check airflow distribution, duct cleaning arrangements and areas that develop differently. Planned remixing may be needed if preferential airflow paths develop. [1, 3, 4]

In a floor-aerated system, positive aeration blows air upwards through the floor. Process air leaves through the pile surface and can be collected separately by ventilation designed for that purpose in an enclosed space. With negative aeration, air enters at the pile surface, is drawn down through the material from top to bottom and exits through the floor into a collection header. Some air may also enter through the sides. The header provides a route to treatment for the extracted stream; it does not capture the emissions from building or unloading the pile on its own. Verify the actual flow direction and gas path for the configuration on offer. [1, 3, 4] See Oxygen, porosity and aeration.

Covers, membranes and enclosed systems

An open-sided roof keeps rain off the material but does not collect process air on its own. A semipermeable membrane covers the windrow. In a bottom-supplied positive-aeration system, air travels through the material and exits through the cover, but gaps at seams or edges can provide bypass routes. The effect on emissions depends on the material, the cover, its installation and the operating stage. Check how water is applied under the membrane and how the cover is removed: lifting it and turning the material may cause short emission peaks that need to be assessed separately. [4–6]

An enclosed bay or tunnel contains part of the process. Floor-supplied air and extraction from above the material can be arranged separately. When doors open, room ventilation and, where appropriate, local extraction matter. In-vessel systems also include containers, drums and other equipment that works in different ways. The key question is what stage the material has reached at discharge. It may be drier or still biologically active and may need curing before quality is assessed. A claim of “compost in 24 hours” needs evidence about the output, not just figures for weight or volume reduction. [1, 2, 4] See Compost maturity, stability and quality.

A machine carrying a roll of cover fabric beside covered and uncovered windrows.
Photo: Compost Systems Handling a fleece cover with a roller. Mechanised covering is a separate operation from aerating the windrow.

Compare technologies on the same basis

Table 1
ConfigurationWhat you can controlWhat to check before choosing
Open turned windrowsHandling, mixing and watering during turningPile geometry and structure in the wet season, work schedule, distance to sensitive neighbours and water management.
Forced-aeration static pilesAirflow or aeration cycles by zone; a collected exhaust stream in suction modeFeed mix, variation in airflow resistance, air distribution, access for cleaning and where the collected air goes.
Windrows with semipermeable membranesExposure to rain and air exchange through the coverHow the system seals at the edges, watering access, handling in wind and what happens when the membrane is lifted.
Active phase in an enclosure or vesselProcess containment and air control during normal operationWhat is captured when doors are open, how exhaust air is treated, where the material cures and how operations continue during equipment downtime.

Give all bidders the same inputs: feedstock types and quantities, seasonal peaks, bulking-agent needs, target product, storage needs and site constraints. Compare resources and costs across the whole process: conditioning, aeration, turning, air capture and treatment, curing, screening and storage. The same nominal active-stage throughput can leave very different operating requirements elsewhere in the facility. [1–3] See Odours and emissions.

Worked example: from 5,200 t/year to active-stage inventory

Illustrative assumptions: the facility receives 5,200 t/year over 260 intake days, five days a week, at a uniform rate. The active stage lasts 21 calendar days, equivalent to 15 loading days on this schedule. Assume that the wet mass entering the active stage equals the mass received, with no additions, rejects, recirculation or losses before discharge. The assumed bulk density of the mix is 0.60 t/m³.

  • 5,200 t/year ÷ 260 intake days/year = 20 t per intake day, not 20 t per calendar day.
  • 20 t per intake day × 15 loading days = 300 t in the active stage at one time in the model. 300 t ÷ 0.60 t/m³ = 500 m³ of mix.
  • If loading rises to 30 t per intake day for all 15 days, the same assumptions yield 450 t, or 750 m³.

The result is a material volume, not a footprint or an allowance for the whole facility. For design, replace the assumptions with the actual mass flow after mixing, measured density, stage-specific mass and volume reductions, residence times and peak inventories. Account for pile geometry, access roads, curing and storage areas, air treatment and water collection. [2, 6] Check applicable site requirements and obtain evidence of performance before making a final selection.

References and further reading

  1. US EPA. Approaches to Composting, sections on pre-processing, windrows, aerated piles and in-vessel systems
  2. NC State Extension. Large-Scale Organic Materials Composting, facility types, siting and separate process areas
  3. FAO (Food and Agriculture Organization of the United Nations) (2003). On-farm composting methods, chapter 3: turning, static pile pressure and suction aeration, and enclosed configurations
  4. Environment Agency. Biological waste treatment: appropriate measures for permitted facilities, sections 8.5–8.7; technical reference from England, not a Romanian requirement
  5. Commission Implementing Decision (EU) 2018/1147, BAT 36–37: process parameters, semipermeable covers and open-air operations; confirm applicability for the specific installation
  6. International Compost Seminar 2026, Austria, 5 October (day 1), “Composting Technology Overview”, PDF pp. 3, 6, 14, 25–32 and 45–48; 8 October (day 4), “Membrane Composting”, PDF pp. 4–9; 7 October (day 3), “Design of a Plant”, PDF p. 6. Organised by Compost Systems GmbH.